208.376.6621

Guide

How a post and panel real estate sign gets installed

What actually happens when the Sign Center crew shows up to install a post and panel sign, from white painted posts to the photos sent when it is done.

A post and panel sign is the standard commercial real estate sign and the big brother of the residential yard arm. Two posts, one printed panel, riders hanging below. The parts are simple, but a sign that stands straight through a Treasure Valley winter and still reads from the road in July takes a process. Here is how the Sign Center crew installs one.

Before the crew leaves the shop

Installation starts at the proof stage. Once the written proof is approved and the panel is printed, the team confirms the address, any gate or access notes, and where on the frontage the sign should go. If the site is unusual, a site survey happens first. The posts are painted white before they go on the truck, so there is no painting on site and the finish is even. The panel, riders and hardware are loaded with the posts, along with digging tools and, on jobs that call for it, concrete.

Step one: locate and dig

At the site the crew walks the frontage with the placement notes in hand and picks the spot where the sign reads best from the road without blocking sightlines at a driveway or corner. A hole is dug for each post. Depth depends on the post height and the panel size, since a taller, wider sign catches more wind and needs more post in the ground. On most residential and standard commercial jobs the posts are set in compacted native soil. Concrete is used only on some jobs, typically larger panels, loose soil or sites where the sign needs to stand for a long time.

Step two: assemble on the ground

Rather than fastening a panel to posts that are already standing, the crew lays the posts on the ground, attaches the panel to them and hangs the riders. Working on the ground keeps the panel square to the posts, keeps the fasteners straight, and lets the crew check rider spacing and alignment before anything is vertical. It is also safer than working overhead with a large MDO panel.

  • Posts laid parallel at the panel width
  • MDO panel fastened to both posts
  • Riders hung on chains or hooks below the panel
  • Everything checked square before lifting

Step three: raise and set

The assembled sign is lifted and the posts are lowered into the holes. The crew checks that the panel is level and the posts are plumb, then backfills and tamps the soil in layers around each post. On concrete jobs the mix goes in around the posts and the sign is braced until it holds. The result is a sign that stands straight and stays that way. A quick look from the road confirms the panel faces traffic squarely and the riders hang level before the tools go back on the truck.

Step four: photograph and send

When the sign is set the crew photographs it from the road and from close enough to read the riders, then sends the photos to the broker or agent. There is no customer walkthrough, so the photos are the confirmation that the sign is up, readable and in the right place. Many brokers forward the photos straight to the listing file or the property owner.

What is not part of the service

The Sign Center does not manage permits. Any permit a city or county requires for a sign is the customer's responsibility before the install is scheduled. The crew also does not perform maintenance or repair on existing signs and does not install lighted or electrical signs, since The Sign Center makes non electric signs only.

Removal and rider swaps

When the listing closes, ask about removal. Riders can be swapped at any time, either by the crew or by the broker, since they hang on the frame rather than being fastened to the panel. A leased rider replacing an available rider is a two minute job.

Why the process matters

A sign that leans, twists or loses a rider in the first windstorm sends the wrong message about the listing and the brokerage. Painting the posts ahead of time, assembling on the ground, setting plumb and photographing the result are the habits that keep Sign Center installs standing straight. Call 208.376.6621 with the address and the brokerage standard and the team will take it from there.

Questions and answers

Do I need to be there for the install?

No. Provide access notes and any placement preferences when you order. The crew installs and sends photos when the sign is up.

Are posts always set in concrete?

No. Concrete is used only on some jobs, such as larger panels or loose soil. Most posts are set in compacted soil.

Do you handle the sign permit?

No. Permits are the customer's responsibility. The Sign Center does not offer permit management.

Talk to a local sign expert

Call, email or send the form. A member of the Boise team replies during business hours.