208.376.6621

Guide

What a builder needs for a new subdivision

The sign program behind a successful community launch: entrance signs, directionals, lot signs, flags and banners, and how to order them as one package.

A subdivision launch is a logistics problem with a marketing problem attached. Buyers need to find the model home from a road they do not know, see what is available once they arrive, and remember the community name when they leave. The sign program does all three jobs. Here is what a complete program looks like, from the entrance to the last lot, and how builders in the Boise area order it from The Sign Center as one package.

The entrance sign

The entrance sign is the anchor. It stands at the main road where buyers turn in, and it is read at the highest speed and from the greatest distance of any sign in the program. It carries the community name, the builder brand, and one line that matters, usually a price point or a phone number. On an arterial or highway the primary line wants letters a foot tall or more. The rule of thumb for letter height is roughly one inch per ten feet of viewing distance, and it is only a rule of thumb, so size up when in doubt. Entrance signs are built as post and panel signs on white painted posts with MDO panels, installed by the crew, and often set in concrete because they stand for the life of the project.

Directionals

Once a buyer turns in, directionals take over. A sign at every turn, with a big arrow and the community or model home name, keeps the buyer moving without a second thought. Count the turns from the entrance to the model home, add one at the entrance and one at the model, and that is the minimum. Directionals are typically CORO or ACM on posts or stakes, sized smaller than the entrance sign because the driver has slowed down. Order spares. Directionals get hit by mowers and delivery trucks.

Lot signs

Lot signs tell the buyer what is for sale, what is spoken for and what the lot number is. A simple system works best: one design for available, one for pending, one for sold, and one for model or spec homes, each with a lot number field. Print them on CORO or ACM so they are easy to pull and replace as the phase sells through. Order the full set for the phase at launch, with extra sold signs, since sold signs are the ones that get used most if the launch goes well.

  • Available: the lot number and a contact
  • Pending: signals momentum without closing the door
  • Sold: the sign every builder wants to put up
  • Model and spec: marks the homes a buyer can walk through today

Flags

Feather flags and banner flags mark the model home and the sales office from across the development and from the arterial. They move, which draws the eye, and they are inexpensive to replace. Place a row at the model home and one or two at the entrance. Order replacements with the first set, since flags are consumable and fade faster than rigid signs.

Banners

Banners cover the gaps. A banner on the construction fence announces the community before the entrance sign is installed. A banner on the model home garage promotes a grand opening or a price promotion. Grommeted vinyl banners are quick to produce and easy to swap, and they let the builder change the message without touching the permanent signs.

Ordering as one program

The most efficient way to sign a subdivision is to order the whole program at once. Send the plat, the brand standards, the phase schedule and the model home location. The design team lays out every piece as a matched set so colors, type and logo use are consistent from the entrance sign to the last lot sign, and sends written proofs for each item. A site survey is available when the entrance or a key intersection needs a look before sizes are set. The install crew sets every post, photographs every sign and sends the photos to the sales team. There is no customer walkthrough. When a new phase opens, the team pulls the files and adds the next round of lot signs and directionals.

What is not included

The Sign Center does not manage permits, so any permit the city or county requires for the entrance sign is the builder's responsibility before installation. There are no lighted or electrical signs, since The Sign Center makes non electric signs only, and no maintenance or repair services for existing signs.

Getting started

Builders including Toll Brothers, CBH Homes and Brighton Homes work with The Sign Center on community programs across the Treasure Valley. Call 208.376.6621 with the plat and the launch date and the team will scope the program.

Questions and answers

How many directional signs does a subdivision need?

One at every turn from the entrance to the model home, plus one at the entrance and one at the model, plus spares.

Can lot signs be updated as homes sell?

Yes. Lot signs are printed on CORO or ACM so they swap easily. Order extra sold signs at launch.

Does the Sign Center handle entrance sign permits?

No. Permits are the builder's responsibility. The Sign Center does not offer permit management.

Talk to a local sign expert

Call, email or send the form. A member of the Boise team replies during business hours.